This has been a long and expensive excavation, we have move over 500 truck loads of material from the site, built a new road and retaining wall with over 130 concrete lock blocks to support the building envelope. The building envelope grade was lowered 3 ft and the garage area was dropped an additional 3 ft to accommodate a more gentle transition from the driveway to the garage.